Paving Project Timeline Guide

Understanding typical project timelines helps you plan effectively and set realistic expectations. Timelines vary based on project size, weather, and site conditions.

Residential Driveway Installation

Residential driveway installation

Standard Driveway (600-800 sq ft)

  • Day 1: Site preparation, excavation, base installation
  • Day 2: Asphalt installation and compaction
  • Day 3: Final cleanup and inspection
  • Total: 2-3 days

Large Driveway (1000+ sq ft)

  • Days 1-2: Excavation and base preparation
  • Day 3: Asphalt installation
  • Day 4: Finishing and cleanup
  • Total: 3-4 days

Commercial Parking Lot

Commercial parking lot

Small Lot (20-30 spaces, ~8,000 sq ft)

  • Days 1-2: Site prep and base installation
  • Days 3-4: Asphalt paving
  • Day 5: Line striping and cleanup
  • Total: 4-5 days

Large Lot (50+ spaces, 20,000+ sq ft)

  • Days 1-3: Excavation and base work
  • Days 4-7: Asphalt installation
  • Day 8: Line striping and final touches
  • Total: 7-10 days

Repair & Maintenance Projects

Crack Sealing

Small driveway (600 sq ft)

2-4 hours

Pothole Repair

Single pothole

30-60 minutes

Sealcoating

Standard driveway

1-2 days (includes dry time)

Line Striping

20-space parking lot

2-4 hours

Factors That Affect Timeline

Weather conditions (rain delays installation)
Site accessibility and space constraints
Existing surface removal requirements
Drainage system installation needs
Base preparation complexity
Permit processing time
Material availability
Project size and scope

Planning Tips

  • Schedule during spring/summer for optimal conditions
  • Book 2-4 weeks in advance during peak season
  • Plan for 24-48 hour curing time before heavy use
  • Consider weather delays in your timeline
  • Clear access routes before work begins