Back to Resources

Paving Project Timeline Guide
Understanding typical project timelines helps you plan effectively and set realistic expectations. Timelines vary based on project size, weather, and site conditions.
Residential Driveway Installation

Standard Driveway (600-800 sq ft)
- • Day 1: Site preparation, excavation, base installation
- • Day 2: Asphalt installation and compaction
- • Day 3: Final cleanup and inspection
- Total: 2-3 days
Large Driveway (1000+ sq ft)
- • Days 1-2: Excavation and base preparation
- • Day 3: Asphalt installation
- • Day 4: Finishing and cleanup
- Total: 3-4 days
Commercial Parking Lot

Small Lot (20-30 spaces, ~8,000 sq ft)
- • Days 1-2: Site prep and base installation
- • Days 3-4: Asphalt paving
- • Day 5: Line striping and cleanup
- Total: 4-5 days
Large Lot (50+ spaces, 20,000+ sq ft)
- • Days 1-3: Excavation and base work
- • Days 4-7: Asphalt installation
- • Day 8: Line striping and final touches
- Total: 7-10 days
Repair & Maintenance Projects
Crack Sealing
Small driveway (600 sq ft)
2-4 hours
Pothole Repair
Single pothole
30-60 minutes
Sealcoating
Standard driveway
1-2 days (includes dry time)
Line Striping
20-space parking lot
2-4 hours
Factors That Affect Timeline
Weather conditions (rain delays installation)
Site accessibility and space constraints
Existing surface removal requirements
Drainage system installation needs
Base preparation complexity
Permit processing time
Material availability
Project size and scope
Planning Tips
- Schedule during spring/summer for optimal conditions
- Book 2-4 weeks in advance during peak season
- Plan for 24-48 hour curing time before heavy use
- Consider weather delays in your timeline
- Clear access routes before work begins
Ready to Schedule Your Project?
Get a detailed timeline estimate for your specific project. We'll work with your schedule.
Call (716) 681-3600